Tradeline, Inc. filters and categorizes new-construction and industry news from regional and professional journals across the country. Here you will find new projects, products, and regulatory updates.
Industry News
University of Michigan Plans Cardiovascular Center
The University of Michigan in Ann Arbor has selected Boston-based Shepley Bullfinch Richardson and Abbott to design its new 350,000-sf cardiovascular center. The center will accommodate 20 intensive care beds, six operating rooms, five cardiac catheterization labs, five electrophysiology labs, two interventional radiology operating rooms, 36 outpatient exam rooms, and a non-invasive testing suite. Construction will begin in fall 2003 with completion in spring 2007.
Oasis Semiconductor Expands in Waltham
Oasis Semiconductor is nearly quadrupling its size with a move from 7,353 sf to 30,000 sf at Waltham Weston Corporate Center in Waltham, Mass. Oasis is a supplier of silicon chips to the office automation market. The move will shift Oasis from the first to the fourth floor of the six-story, 300,000-sf building.
University of Texas Develops Laser Center
The University of Texas is planning the Texas Center for High-Intensity Laser Science. The facility will accommodate scientists studying and manipulating the interactions of matter with a high-intensity laser. The center, slated for completion in three years, will be built in an underground bay on the university’s Austin campus.
University of Washington Develops Medical Research Center
The University of Washington is renovating the 105,00-sf Blue Flame Building in the South Lake Union neighborhood of Seattle as the future home of UW Medicine Lake Union. Vulcan Inc. is the design and construction planner for the project, which is slated to begin in January and reach completion in November 2004. The building will house cancer research, the Program for Translational Medicine in Women's Health, and the Center for Cardiovascular Biology.
Ellis Hospital Plans Schenectady ICU
Ellis Hospital plans to build a new $20-million, 36-bed intensive care unit at its Schenectady, N.Y., location. The two-floor unit will be located in the hospital’s A-wing to allow critically ill patients access to key services. Work is expected to begin in summer 2004 and reach completion in 18 months. The facility will replace the hospital’s 20-bed ICU that was built in 1973.