Tradeline, Inc. filters and categorizes new-construction and industry news from regional and professional journals across the country. Here you will find new projects, products, and regulatory updates.
One United Properties began construction in August of 2024 on One Technology District, a semiconductor R&D center in Bucharest, Romania. Infineon Technologies will occupy the facility and has committed to a 15-year lease that represents a total contract value of $62.2 million. Positioned to become the largest semiconductor hub in southeast Europe, the innovation complex will offer a gross leasable area of 222,000 sf, including 32,000 sf of next-generation lab space.
Whitworth University is constructing the $20 million PACCAR Engineering Building in Spokane, Wash. Integrus Architecture's vision for the two-story facility will provide approximately 21,000 sf of space arranged around three phases of the creative process. EXPLORE will include classrooms, seminar rooms, research labs, and administrative offices. DESIGN will incorporate a computational design lab and a prototyping suite, and MATERIALIZE will offer a metal fabrication shop and resources for working with other materials.
The University of Rochester Medical Center (URMC) is partnering with Grumman|Butkus Associates on a retrocommissioning initiative that is expected to deliver significant energy savings. Spanning nearly 1.7 million sf, the project includes the evaluation of seven existing buildings to identify deficiencies and craft innovative solutions.
Texas Tech University opened the $112.5 million Academic Sciences Building in Lubbock in August of 2024. Enhancing the student experience with new venues for active learning and exchange, the 130,000-sf facility was designed by BGK Architects and EYP Architecture & Engineering (now a Page company). The three-story structure provides teaching and laboratory space for five departments: chemistry and biochemistry, physics and astronomy, biological sciences, geosciences, and psychological sciences.
UCSF Health is planning to construct a $1.49 billion hospital in Oakland that will enable the delivery of world-class pediatric care for decades to come. Designed by SmithGroup to optimize therapeutic outcomes, the seven-story, 277,500-sf facility will be illuminated by natural light, with numerous outdoor areas that are accessible to patients, families and staff. Strategic programming will allow sophisticated instrumentation to be accessed when needed without impeding clinical processes.