Skip to main content

Biomedical

UK Medical Research Council Plans London Institute of Medical Sciences

Published 9/2/2018

The United Kingdom's Medical Research Council is planning to build the £75 million London Institute of Medical Sciences. Designed by Hawkins\Brown, the 110,000-sf project will provide collaborative biomedical research facilities including two CL-2 biocontainment labs, vibration-mitigated imaging suites, core biotechnology labs, write-up areas, and a data center. The nine-story facility is being created in partnership with Imperial College London and will accommodate up to 45 research groups currently dispersed around Hammersmith Hospital.

Read More

Exact Sciences Breaks Ground on Madison Headquarters

Published 8/31/2018

Exact Sciences broke ground in August of 2018 on its new corporate headquarters in Madison, Wis. Located in the University Research Park developed by UW Madison, the five-story, 138,000-sf Innovation One facility will be fully leased by Exact Sciences. The $60 million project was designed by Valerio Dewalt Train Associates and is being built by general contractor Findorff.

Read More

Texas Tech University Plans School of Veterinary Medicine

Published 8/30/2018

Texas Tech University is planning to build a $90 million facility for the School of Veterinary Medicine in Amarillo. Located at the Texas Tech Health Sciences Center, the two-building complex will include a clinical skills training center for large animal procedures. The school will accommodate 60 students per year for a total enrollment of 240 for the four-year program, as well as serving up to 200 graduate students who are not seeking a doctorate in veterinary medicine. Construction could begin as early as fall of 2019 with completion in fall of 2021.

Read More

Atara Biotherapeutics Opens Thousand Oaks Manufacturing Facility

Published 8/23/2018

Atara Biotherapeutics opened a $55 million manufacturing facility in June of 2018 in Thousand Oaks, Calif. Designed by HPA Architects to meet LEED sustainable design criteria, the Atara T-cell Operations and Manufacturing (ATOM) center houses a 90,000-sf facility for the production of CAR-T allogeneic therapies, as well as additional R&D labs and offices. The project was developed by Sares-Regis Group with Atara signing a 15-year lease for the building.

Read More

Pfizer Builds Modular Aseptic Processing Facility

Published 8/6/2018

Pfizer is planning to construct a 400,000-sf modular aseptic processing facility on its existing campus in Portage, Mich. Part of a $1.1 billion investment in Kalamazoo County over the next six years, the $465 million center will be one of the world’s most advanced facilities for the manufacture of sterile injectables.

Read More

Ross University Opens Veterinary Research Building

Published 7/30/2018

Ross University’s School of Veterinary Medicine opened the $10.5 million Research and Pathology Building in July of 2018 in Basseterre, Saint Kitts. Providing eight laboratories, the 19,000-sf facility offers 13,000 sf of research space, 4,000 sf of student space including a 1,500-sf learning center, and 2,000 sf of pathology space with suites for necropsy and histology. Designed to promote multidisciplinary collaboration and interaction, the building will support the One Health initiative in addressing the interconnectivity of animal, human, and environmental health.

Read More

University of Vermont Plans Biomedical Research Complex

Published 7/28/2018

The University of Vermont is planning to build the $45 million Biomedical Research Complex in Burlington. Designed by Payette and Black River Design, the project includes construction of a 60,000-gsf (35,000-asf) facility to provide flexible, collaborative research space for the Larner College of Medicine. LEED Silver sustainable design certification will be sought for the project, which will allow faculty and staff to share resources efficiently across disciplines and departments.

Read More

16 Tech Plans Advanced Research and Innovation Facility

Published 7/21/2018

16 Tech Community Corporation will break ground in fall of 2018 on the $30 million Advanced Research and Innovation Facility in Indianapolis. The Indiana Biosciences Research Institute will lease space in the five-story, 120,000-sf building, which represents the first phase of construction in the 16 Tech Innovation District. The 60-acre development will include a second office and research building, a 250-unit apartment complex, and renovated warehouse facilities.

Read More

Harvard Researchers Highlight Nine Foundations of Healthy Buildings

Published 7/13/2018

Harvard University's Center for Climate Health and the Global Environment (C-CHANGE) has created the Healthy Buildings Program to study the effects of the built environment on health, productivity, and wellbeing. The nine foundations of a healthy building can optimize occupant health, preferably in a smoke-free environment with active design to promote movement.

Read More

Vertex Pharmaceuticals Opens San Diego Research Facility

Published 7/10/2018

Vertex Pharmaceuticals opened a 170,000-sf R&D facility in San Diego in June of 2018. Although over 70 percent of the Torrey Pines center is dedicated to research, the project also features a 4,000-sf business incubator suite and a 1,500-sf learning lab for STEAM programs in science, technology, engineering, arts, and mathematics. Alexandria Real Estate Equities oversaw construction of the leased site, which has attained LEED Gold sustainable design certification.

Read More

University of Aberystwyth Plans BSL-3 Veterinary Hub

Published 7/6/2018

The University of Aberystwyth is planning to create VetHub 1, a human and animal health research facility in the United Kingdom. Located on the Penglais campus in Aberystwyth, the project includes the renovation and expansion of an existing 5,231-sf structure to provide three BSL-3 labs, two BSL-2 labs, and associated office spaces. The facility will support the development of new products, diagnostic tests, and strategies for the nation's agricultural, veterinary, and biotechnology industries. 

Read More

Hackensack Meridian Health Opens HOPE Tower at Jersey Shore University Medical Center

Published 7/1/2018

Hackensack Meridian Health opened the $265 million HOPE Tower at Jersey Shore University Medical Center in June of 2018. Located in Neptune, N.J. the 10-story, 300,000-sf cancer research and treatment facility features a 58,000-sf patient care center offering radiation therapy, medical oncology, surgical specialties, and minimally invasive therapies. The tower also includes biomedical research labs, a 6,500-sf simulation training center, a 200-seat conference auditorium, a clinical trials center, and space for academic programs.

Read More

Purdue University Constructs Biomedical Engineering Addition

Published 6/29/2018

Purdue University began construction in June of 2018 on a $14 million addition to the Martin C. Jischke Hall of Biomedical Engineering in West Lafayette, Ind. Designed by BSA LifeStructures, the 29,500-sf Innovation Wing will provide the Weldon School of Biomedical Engineering with open-concept wet labs; translational research labs, including a behavioral core; a multidisciplinary student design lab; and support spaces. The addition will also offer active learning environments, offices for faculty and graduate students, and interactive team areas.

Read More

Nottingham Trent University Constructs Engineering and Medical Technologies Buildings

Published 6/11/2018

Nottingham Trent University began construction in June of 2018 on two new STEM buildings in Nottingham in the United Kingdom. Located on the Clifton campus, the £22 million Medical Technologies Innovation Facility will provide sophisticated research and development labs, write-up areas, instructional spaces, offices, and a conference room. Designed by GSSArchitecture, the two-story interdisciplinary building will accommodate industry partnerships to accelerate the commercialization of new health technologies.

Read More

AstraZeneca Opens South San Francisco Facility

Published 6/6/2018

AstraZeneca opened its 163,000-sf South San Francisco facility in May of 2018. Located in the Cove at Oyster Point, the project houses a total of 400 employees from four organizations: Acerta Pharma, MedImmune, Pearl Therapeutics, and Technology Innovation & Delivery Excellence (TIDE). Designed by HOK to promote collaboration and innovation, the open lab and office environments incorporate AstraZeneca’s iWork philosophy, an activity-based approach that embraces industry best practices.

Read More