Skip to main content

Information Technology

University of Cincinnati Constructs Digital Futures Building

Published 1/23/2020

The University of Cincinnati is constructing the 180,000-sf Digital Futures Building in the Uptown Innovation Corridor. Designed by KieranTimberlake with Research Facilities Design (RFD) as laboratory design consultant, the interdisciplinary facility will provide applied research labs for the creation of innovative robotic, automotive, and unmanned aerial vehicle (UAV) technologies.

Read More

Arizona State University Breaks Ground on Digital Innovation Campus

Published 1/20/2020

Arizona State University broke ground in January of 2020 on a $73.5 million digital innovation campus in Mesa. Designed by Holly Street Studio and Bohlin Cywinski Jackson, the 118,000-sf facility will accommodate programs in digital and sensory technology, media arts, experiential design, gaming, and film production for the Herberger Institute for Design and the Arts.

Read More

Trinity College Dublin Plans E3 Learning Foundry

Published 1/18/2020

Trinity College Dublin will begin construction in mid-2020 on the Martin Naughton E3 Learning Foundry in Ireland. Supporting a project-based pedagogy for STEM education, the $67 million interdisciplinary facility will offer interactive learning spaces and laboratories for the Engineering, Environment and Emerging Technologies Institute. Designed by Feilden Clegg Bradley Studios to promote collaboration and innovation, the six-story, 78,102-sf building will be shared by the schools of engineering, natural sciences, and computer science and statistics.

Read More

Worcester Polytechnic Institute Constructs Academic and Research Facility

Published 1/14/2020

Worcester Polytechnic Institute is constructing an $80 million academic and research facility in Worcester, Mass. Designed by Gensler, the 100,000-sf building will provide interactive spaces for project-based education including flexible learning environments and innovation labs for collaborative development with industry and government partners.

Read More

Gannon University Builds Institute for Health and Cyber Knowledge

Published 1/10/2020

Gannon University is building the Institute for Health and Cyber Knowledge (I-HACK) in Erie, Pa. The $20 million project involves the renovation and expansion of an existing six-story tower to accommodate leading-edge programs in cybersecurity, cyber engineering, healthcare systems, computer-based applications, and business management. The first $13 million construction phase includes the creation of an entrance lobby on the first floor, with the second floor accommodating the Pierre McCormick Cyber Learning Center.

Read More

George Mason University Plans Digital Innovation Campus

Published 1/4/2020

George Mason University is planning to build a digital innovation campus in Arlington, Va. Creating a collaborative hub for research, education, and entrepreneurship, the project includes the demolition of an existing structure and the construction of a 360,500-gsf mixed-use facility and parking garage. Designed by EYP Architecture & Engineering, the $200 million building will house the School of Computing, the Institute for Digital InnovAtion (IDIA), and corporate R&D labs with co-working spaces.

Read More

Stevens Institute of Technology Opens Gateway Academic Center

Published 1/1/2020

Stevens Institute of Technology opened the $68 million Gateway Academic Center in December of 2019 in Hoboken, N.J. Designed by WRT, the 89,500-sf teaching and research facility is comprised of two buildings connected by a glass skybridge. The four-story complex provides 10 technology-rich classrooms, 13 labs, 45 faculty offices, conference rooms, reception halls, areas for student organizations, and multipurpose flex spaces.

Read More

Virginia Tech Renovates and Expands Holden Hall

Published 12/30/2019

Virginia Tech is renovating and expanding Holden Hall in Blacksburg. The existing 42,100-gsf building houses engineering programs in mining, minerals, and materials science. The project includes a complete renovation of the central structure, as well as demolition of two single-story wings and construction of a three-story wing and a four-story wing.

Read More

US Air Force Plans Intelligence Production Complex

Published 12/28/2019

The US Air Force will begin construction in early 2020 on the $182 million Intelligence Production Complex at Wright-Patterson Air Force Base in Ohio. The 225,000-sf facility will provide secure labs and offices to support mission-critical defense initiatives. The project represents a 40 percent expansion of the National Air and Space Intelligence Center and is the largest single-site construction project in the base's history.

Read More

Purdue University Plans Data Science Building

Published 12/26/2019

Purdue University will begin construction in November of 2020 on the $40 million Data Science Building in West Lafayette, Ind. Providing leading-edge classrooms and learning environments, the 86,000-sf facility will include collaborative research space for faculty and graduate students from the College of Science. Supporting Purdue's Integrative Data Science Initiative, the four-story project will accelerate the university's strategic plan to be a national and global leader in the field of data science and education. Completion is expected in June of 2022.

Read More

US Navy Breaks Ground on Cyber Warfare Engineering Laboratory

Published 12/22/2019

The US Navy broke ground on the Cyber Warfare Engineering Laboratory in December of 2019 in Dahlgren, Va. The 10,000-sf facility will provide classified research space for the development, testing, and analysis of hardware and software systems for military weapon systems. Designed as a consolidated hub for the Naval Surface Warfare Center Dahlgren Division's cyber engineering operations, the project will enable the creation of resilient network platforms and infrastructure, as well as accommodating interactive personnel training and evaluation.

Read More

Boston University Breaks Ground on Center for Computing & Data Sciences

Published 12/20/2019

Boston University broke ground on the $288 million Center for Computing & Data Sciences in December of 2019. Located on the Charles River Campus, the 19-story structure will comprise a four-story podium topped by 13 floors, with MEP systems located on additional basement and penthouse levels. Collocating the departments of statistics, mathematics, and computer science, the 350,000-sf building will include terraced platforms with whiteboard walls and a collaboration ramp to promote interaction and innovation.

Read More

Michigan State University and Health Innovation Partners Break Ground on Medical Innovation Building

Published 12/6/2019

Michigan State University broke ground on the $85 million Doug Meijer Innovation Building in Grand Rapids in November of 2019. Designed by SmithGroup, the 205,000-sf facility will house multiple tenants including Spectrum Health, BAMF Health, and MSU's College of Human Medicine. The collaborative six-story building will enable the discovery and commercialization of new medical devices, artificial intelligence technologies, and treatments for cancer and dementia.

Read More

Apple Breaks Ground on Austin Campus

Published 12/4/2019

Apple broke ground in November of 2019 on a $1 billion campus in Austin, Texas. The 133-acre development will provide three million square feet of integrated research, office, and production facilities nestled in abundant green space, which will occupy 60 percent of the site. Powered entirely by renewable energy, the complex will initially house 5,000 employees with full occupancy estimated at 15,000. Occupancy is expected in 2022. The project will include a 50-acre nature and wildlife preserve that will be open to the public. 

Read More

Amazon Plans Robotics Innovation Hub

Published 12/1/2019

Amazon is planning to construct a $40 million robotics innovation hub in Westborough, Mass. The 350,000-sf facility will enable teams of researchers, engineers, and technicians to design, build, program, and test robots, including self-driving units for order fulfillment and warehouse management. The project will house R&D labs, manufacturing space, corporate offices, and a distribution center. Completion is expected in 2021.

Read More