Skip to main content

EMD Serono Completes Construction Horizon R&D Building

Published 4/13/2022
EMD Serono - Horizon Building
EMD Serono - Horizon Building
EMD Serono - Horizon Building

EMD Serono completed construction in March of 2022 on the $70 million Horizon Building in Billerica, Mass. Designed by PM Group, the 149,000-sf structure provides collaborative research environments to accelerate the creation of specialty pharmaceuticals. The mixed-use R&D facility includes approximately 30,000 sf of flexible wet lab space featuring reconfigurable benches and overhead service panels with plug-and-play connectivity. Linked by pedestrian bridges to the existing campus, the highly interactive building includes open office environments, conference rooms, huddle areas, and a central cafeteria. With an emphasis on reducing or eliminating occupational hazards and risks, the four-story development integrates Prevention through Design principles and has also attained WELL Platinum and LEED Gold certifications. 

The project team included Erland Construction, mechanical and electrical engineer BR+A, civil engineer BSC Group, structural engineer LeMessurier, and interior designer Intec Group.

EMD Serono is the biopharmaceutical subsidiary of Merck KGaA, based in Darmstadt, Germany.

Organization Project Role
BR+A Consulting Engineers
Mechanical & Electrical Engineer
BSC Group
Civil Engineer
LeMessurier Consultants Inc.
Structural Engineer
Intec Group
Interior Designer