Skip to main content

Latest Reports

Tradeline's industry reports are a must-read resource for those involved in facilities planning and management. Reports include management case studies, current and in-depth project profiles, and editorials on the latest facilities management issues.

UPenn Replaces the HVAC System of a Fully Occupied, Operational Chemistry Facility

Published 5/4/2016

Signing the American College and University Presidents’ Climate Commitment pledge is one thing, but complying with it is quite another. At the University of Pennsylvania, compliance meant renovating the HVAC systems in a 140,000-gsf chemistry research and teaching facility built in 1973. Converting the building’s constant-volume ventilation system, which provided 22 air changes per hour (ACH) 24 hours a day, to a variable-volume system providing 4 to 12 ACH would yield massive energy savings. The catch? Doing it without kicking anyone out.

Read More

Successful Planning of Interdisciplinary Science Facilities

Published 4/27/2016

At the inception of a new interdisciplinary science building, bricks-and-mortar considerations must take a back seat to a big-picture view of issues related to organization, funding, governance, and the long-range vision of the institution. The resolution of these issues early on leads to projects that are more successful—not necessarily in terms of cost savings, but in the essential criterion of aligning a new facility with specific academic strengths and the broader institutional mission.

Read More

State University of New York, Buffalo State, Science Building No. 15

Published 4/20/2016

SUNY Buffalo State has completed the second phase of a three-phase project that will transform its science education facilities by consolidating multiple science departments into a single facility, establishing a hub for the STEM curriculum. Originally built in 1962, the 171,000-sf Science Building No. 15 undertook a $107 million expansion project to create a science complex that is one of the few interdisciplinary facilities in the SUNY system.

Read More

Eastman’s Revised Workspace Model for New Corporate Business Center

Published 4/20/2016

Eastman’s new corporate business center models collaborative design in process and form. The 296,000-sf facility, located at the corporate headquarters in Kingsport, Tenn., houses more than 100 shared meeting spaces, with state-of-the art technology, revised workspace designs, and several areas where employees can greet visitors or work away from their desks.

Read More

Learned Hall Engineering Expansion Phase 2 (LEEP2)

Published 4/13/2016

The University of Kansas has completed the second phase of a major expansion of its engineering facilities to accommodate a 50 percent increase in the number of engineering graduates. The Learned Hall Engineering Expansion Phase 2 (LEEP 2) completes the new engineering complex by connecting two existing buildings: Learned Hall, built in 1963, and the Measurement, Materials and Sustainable Environment Center (M2SEC), completed in 2012.

Read More