Skip to main content

Pennsylvania State University Opens Susan Welch Liberal Arts Building

Published 6/5/2025
Previous Next

Pennsylvania State University opened the $128 million Susan Welch Liberal Arts Building in May of 2025. Designed by Bohlin Cywinski Jackson, the 144,350-sf project enables a forward-thinking model of social science teaching, research, and outreach that unites previously dispersed disciplines. The six-story structure collocates the departments of anthropology, political science, and sociology and criminology, as well as housing the Social Sciences Research Institute, the Population Research Institute, the School of Public Policy, and the School of International Affairs. Representing the first new liberal arts facility on Penn State's University Park campus in nearly half a century, this dynamic hub also accommodates the McCourtney Institute for Democracy, the Criminal Justice Research Center, and several general-purpose classrooms.

The first floor provides undergraduate instructional spaces, collaboration venues, and areas for group and individual study. On the upper levels, wet and dry research labs and faculty offices are complemented by conference and event rooms that are shared by all departments. The relocated Matson Museum of Anthropology offers unique opportunities for academic discovery and public engagement. A highly efficient and scalable system for housing the museum's stored collections was created by Diversified Storage Solutions.

Turner Construction was the general contractor for the high-performance building, which integrates mass timber and is targeting LEED Silver certification. With a roof designed to support photovoltaic panels in the future, the structure is connected to the university's water reuse system which allows stormwater runoff to be captured in an underground retention center. A sophisticated ventilation system supplies 100 percent outside air to the classrooms, labs, and museum, and bird-friendly glass prevents window strikes in high-risk zones.

The project team included HERA Laboratory Planners, PCS Structural Solutions, Pacific Surveying & Engineering Services, Hoxie Huggins Construction, Cascade Joinery, and Quantum Windows & Doors. Ground was broken on the development in August of 2022.

Organization Project Role
Bohlin Cywinski Jackson
Architect
Turner Construction
General Contractor
HERA Laboratory Planners
Laboratory Planner
PCS Structural Solutions
Structural Engineer
Pacific Surveying & Engineering Services
Civil Engineer
Hoxie Huggins Construction
Contractor
Cascade Joinery
Timber & Joinery Designer
Quantum Windows & Doors
Glazing Solutions Provider
Diversified Storage Solutions
Museum Storage Provider