Skip to main content

Higher Education

Louisiana State University Opens AgCenter

Published 8/27/2014

Louisiana State University opened the $14 million Animal and Food Sciences Laboratories Building in August of 2014 in Baton Rouge. The two-story, 49,000-sf facility provides labs, offices, conference rooms, and a classroom. Accommodating LSU's food, animal and veterinary science programs, the AgCenter features a food incubator and core facilities for sample processing and other services. Construction began on the facility in January of 2012. The total project cost was over $20 million.

Read More

Royal Melbourne Institute of Technology Completes Micro Nano Research Facility

Published 8/25/2014

The Royal Melbourne Institute of Technology (RMIT) completed construction of the Micro Nano Research Facility in August of 2014. Located on the University City campus in Melbourne, the collaborative 13,000-sf facility provides Class 100 and Class 1,000 cleanrooms, a PCL-2 biocontainment lab, a sensor technology lab, offices, training suites, and conference rooms. The multidisciplinary project was designed by SKM Jacobs and built by Brookfield Multiplex.

Read More

Merkert Chemistry Center

Published 8/20/2014

Boston College has renovated 6,500 sf of undergraduate teaching laboratories in the Merkert Chemistry Building to create state-of-the-art learning environments that support strong interactive relationships between instructors, teaching assistants, and students. The project includes three teaching laboratories for general and analytical chemistry. The dual goals were:

Read More

Kansas State University Breaks Ground on Bulk Solids Innovation Center

Published 8/19/2014

Kansas State University broke ground in July of 2014 on the Bulk Solids Innovation Center in Salina. Designed by Jones Gillam Renz Architects, the 130,000-sf facility will be the only research hub in North America for the study of bulk solids materials handling. The center is being built by Ron Fowles Construction and occupancy is expected in April of 2015.

Read More

Whittier College Plans Science and Learning Center

Published 8/15/2014

Whittier College will begin construction in spring of 2015 on a $46 million renovation of the Stauffer Science Building in Whittier, Calif. Designed by Steinberg Architects of Los Angeles, the 88,000-sf structure will be renamed the Science and Learning Center and will provide a collaborative, interdisciplinary environment for STEM (science, technology, engineering, and mathematics) programs. The laboratory design consultant for the project is Research Facilities Design (RFD) of San Diego. Completion is expected in 2017.

Read More

Remodeling Buildings into Modern, Sustainable STEM Facilities

Published 8/13/2014

With careful planning, institution-wide involvement, and innovative thinking, sustainability goals for science, technology, engineering, and math (STEM) facilities can be met by renovating and remodeling instead of more expensive new construction, without compromising the educational mission.

Read More

Georgia Gwinnett College Opens Allied Health and Science Building

Published 8/13/2014

Georgia Gwinnett College opened the $30 million Allied Health and Science Building in August of 2014 in Lawrenceville. The three-story, 91,000-sf interdisciplinary facility provides laboratories for biology, chemistry, physics, and anatomy and physiology, as well as housing classrooms, faculty offices, and study areas. The second floor of the building accommodates the nursing program and includes a technology-rich classroom for team-based learning and a simulation training center with a 14-bed clinical practice lab.

Read More

Emerson Climate Technologies Builds University of Dayton Innovation Center

Published 8/8/2014

Emerson Climate Technologies will begin construction in October of 2014 on a 40,000-sf facility located on the University of Dayton campus. The Innovation Center will support the development of advanced heating, ventilation, air conditioning, and refrigeration (HVACR) technologies and will house up to 50 employees. The construction cost of the facility is approximately $20 million with a total project cost of between $35 million and $40 million.

Read More

Clark College Plans STEM Building

Published 8/6/2014

Clark College will break ground in late summer of 2014 on a $41 million facility to support STEM (Science, Technology, Engineering and Mathematics) programs. Located in Vancouver, Wash., the 70,000-sf, three-story project will provide technology-rich classrooms, labs, offices, and study spaces for the departments of biology, chemistry, physics, and engineering. Mechanical systems to support the facility will be located on the basement level. Completion is expected by December of 2015 with occupancy in fall of 2016.

Read More

iThemba Labs Opens Accelerator Mass Spectrometry Facility

Published 8/5/2014

iThemba Labs opened the Accelerator Mass Spectrometry Laboratory in July of 2014 in Johannesburg, South Africa. The facility is the first of its kind in Africa and will support biomedical, pharmaceutical, geological, and environmental research, as well as supporting advanced sample dating techniques for paleontology.

Read More

University of Kentucky Implements Lynn Imaging's Construction Information Management Software

Published 8/3/2014

University of Kentucky officials are using a new digital construction information management tool to manage over 30 active projects totaling approximately $800 million. The Web-based eCommunication system designed by Lynn Imaging was adopted as the University enters a significant capital development phase, with projects including a major expansion and upgrading of the Student Center, a modernization to Commonwealth Stadium, a state-of-the-art science classroom and lab facility, and interior fit-out of the new University Patient Care Facility.

Read More

Lycoming College Builds Lynn Science Center

Published 8/2/2014

Lycoming College is constructing the Lynn Science Center in Willliamsport, Pa. The three-story, 26,000-sf facility will provide teaching and research labs, classrooms, faculty offices, student lounges, an atrium, and a planetarium. Housing the departments of astronomy, biology, chemistry, and physics, the project is designed to foster interaction and interdisciplinary collaboration. The facility will be built adjoining the existing Heim Biology and Chemistry Building to provide almost 90,000 sf of instructional space.

Read More

Indiana University and Ivy Tech Plan Arts and Sciences Building

Published 7/30/2014

Indiana University is partnering with Ivy Tech Community College to build the 133,500-sf Arts and Sciences building in Gary, Ind. Supported by $45 million in state funding, the shared three-story facility will accommodate IU Northwest's fine and performing arts programs as well as teaching labs for Ivy Tech's science curriculum. The project will also include a 500-seat performance venue, a black box theater, shared classrooms, meeting rooms, informal study space, and departmental and administrative offices. Occupancy is expected in 2017.

Read More

Murray State University Builds Veterinary and Science Facilities

Published 7/25/2014

Murray State University will begin building the $36.6 million Breathitt Veterinary Center in September of 2014 in Hopkinsville, Ky. Designed by Foil Wyatt Architects & Planners, the 61,000-sf facility will open in 2016. Additionally, work will begin in February of 2015 on the $36.8 million Engineering and Physics building; completion is slated for August of 2016.

Read More

St. John Fisher College Breaks Ground on Integrated Science Building

Published 7/22/2014

St. John Fisher College broke ground on the $14 million Integrated Science and Health Sciences Building in July of 2014 in Rochester, N.Y. The collaborative 31,000-sf facility will provide two multipurpose labs, two 100-seat flexible classrooms, science teaching labs, faculty offices, and interdisciplinary research space. The building will also include core facilities for tissue culture, nanobiology, and aquatic research. LEED sustainable design certification will be sought for the project and occupancy is slated for fall of 2015.

Read More