Skip to main content

Laboratory: R+D

Auburn Research and Technology Foundation Breaks Ground on RFID Lab

Published 5/18/2026

The Auburn Research and Technology Foundation (ARTF) broke ground in April of 2026 on a $22 million facility for Auburn University's RFID Lab in Alabama. The 100,000-sf building was designed by Goodwyn Mills Cawood to meet the growing demands of innovation, research, and collaboration in advancing the development of radio frequency identification technologies.

Read More

Integrating Artificial Intelligence into Animal Research Facilities

Published 5/13/2026

At the University of North Carolina at Chapel Hill (UNC), which ranks 11th in the nation in research expenditures, the question of how to integrate artificial intelligence (AI) into research facilities is no longer theoretical—it is urgent. The institution operates a vast and diverse research enterprise across multiple buildings. That scale, combined with rapid shifts in federal science policy, has prompted a fundamental reassessment of how research infrastructure is designed, operated, and managed.

Read More

University of Utah Health Dedicates Sorenson Center for Medical Innovation

Published 5/1/2026

The University of Utah Health dedicated the James LeVoy Sorenson Center for Medical Innovation in April of 2026 in Salt Lake City. Designed by VCBO Architecture, the $50 million facility will foster hands-on discovery, bridge connections between academia and industry, and accelerate the translation of leading-edge science into improved patient outcomes. The 60,000-sf building houses an ISO 8-compliant cleanroom, as well as advanced prototyping and assembly labs with the latest equipment for rapid design and fabrication.

Read More

Ford to Transform Product Development Center into World Headquarters Facility

Published 4/30/2026

Ford Motor Company is planning to repurpose its former Product Development Center as part of the 3.3 million-sf World Headquarters Complex in Dearborn, Mich. The transformed facility, to be known as World Headquarters South, will provide a modern workplace for 5,000 employees. Existing studios will be converted into flexible, double-height environments accommodating laboratories, vehicle testing operations, and prototyping. 

Read More

Texas A&M University Breaks Ground on Semiconductor Institute

Published 4/29/2026

Texas A&M University broke ground in April of 2026 on the Texas A&M Semiconductor Institute on the RELLIS campus in Bryan. Designed by Stantec, the $226 million research and development building aims to elevate regional leadership in the industry and advance next-generation discoveries. The collaborative 80,000-sf structure will feature Class 100 and 1000 cleanrooms modeled after fabrication facilities to enable full-scale production.

Read More

Aviva Investors Completes Construction on Life Sciences Facility

Published 4/28/2026

Aviva Investors completed construction in April of 2026 on a 56,000-sf life sciences facility in Cambridge in the United Kingdom. Located in the Chesterford Research Park, the Sidney Sussex Building houses 10 individual R&D suites that range upwards from 2,245 sf in size and offer wet labs, open office environments, and write-up areas. BCR Infinity Architects designed the flexible structure to be scaleable, providing the ability to combine units to accommodate unique tenant requirements and support growth.

Read More

Procter & Gamble Plans Gillette Headquarters and Technical Innovation Center

Published 4/1/2026

Procter & Gamble is creating a new R&D facility for subsidiary firm Gillette in South Boston. Representing an investment of nearly $1 billion, the nine-story building with feature the Technical Innovation Center as well as serving as the headquarters for Gillette's grooming business. The 324,315-sf structure was designed by Payette as an integrated destination for research, engineering, product development, and administration, uniting operations currently spread over the company’s 31-acre campus.

Read More

Building the Miracle Factory: Mayo Clinic’s Vision for Biomanufacturing

Published 3/31/2026

From cortisone to CAT scans, the future of medicine has often arrived first at the Mayo Clinic. The tradition continues today with the fit-up of a new headquarters for regenerative biotherapeutics adjacent to the research center’s Rochester, Minn., campus. The fourth floor of the recently built Discovery Square building, Two Discovery Square, had been earmarked originally for office space, but after COVID hit, the developer offered the opportunity to convert some of the office space to laboratory space. Mayo Clinic had been planning to build a Center for Regenerative Biotherapeutics and saw an opportunity to lease the 18,000-sf space at Discovery Square and convert it for this cutting-edge biomanufacturing facility.  

Read More

CordenPharma Colorado Partners with BioMed Realty on Peptide Development Lab Expansion

Published 3/30/2026

CordenPharma Colorado is partnering with BioMed Realty to expand its peptide development capabilities in Boulder with the lease of a 64,000-sf facility in Flatiron Park. Located near the CDMO’s large-scale peptide manufacturing hub, the state-of-the-art building will accommodate process development and analytical services, enabling seamless integration of advanced peptide API (Active Pharmaceutical Ingredient) creation from production to commercialization.

Read More

Carnegie Mellon University Opens Robotics Innovation Center

Published 3/23/2026

Carnegie Mellon University celebrated the opening of the $100 million Robotics Innovation Center (RIC) in late February of 2026. Located at Hazelwood Green, the site of a former steel mill in Pittsburgh, the 150,000-sf facility embodies the evolution of that industrial heritage by uniting programs in robotics, automation, and artificial intelligence under one roof. Perkins Eastman's vision for the three-story structure created flexible high-bay research spaces and R&D venues that can address robotic systems at different scales.

Read More

University of Missouri-Kansas City Constructs Healthcare Delivery & Innovation Building

Published 3/6/2026

The University of Missouri-Kansas City (UMKC) is constructing the $145 million Healthcare Delivery & Innovation Building to provide leading-edge environments for immersive learning, training, and discovery. Shaped by the architectural expertise of RDG Planning & Design and Clark & Enersen, the 160,000-sf facility will enable the next generation of medical professionals to gain hands-on experience in the delivery of team-based care. 

Read More

Construction Continues on UCLA Research Park

Published 3/4/2026

The University of California, Los Angeles is constructing the UCLA Research Park to create an engine of innovation and economic growth for Southern California and beyond. The visionary project is transforming the former Westside Pavilion shopping mall into a dynamic destination where basic scientists join with industry experts to advance discovery and commercialization. Acquired by UCLA in December of 2023, the property encompasses more than 1.3 million gsf on 9.2 acres, with two main buildings spanning a total of 700,000 sf connected by an enclosed pedestrian bridge.

Read More

JLL Announces Class A R&D Facility For Sale or Lease in Rockland County

Published 3/2/2026

JLL has announced the availability of a 235,000-sf Class A R&D facility in Suffern, N.Y., for sale and/or lease on behalf of Regeneron, a biotechnology company based in Westchester County. Designed by HLW, 1 Avon Place is purpose-built for research and development and offers a highly adaptable layout supported by existing lab, office, and robust technical infrastructure.

Read More

The Sherwin-Williams Company Consolidates R&D Centers to Boost Collaboration and Increase Efficiency

Published 2/17/2026

To maximize scientific synergies and encourage innovation, The Sherwin-Williams Company made the decision to combine two of its largest R&D organizations into a new global R&D center in Brecksville, Ohio. The 600,000-sf facility, named the Morikis Global Technology Center, began hosting some 900 Sherwin-Williams employees—including chemists, engineers, technicians, and support teams—upon opening in December 2025. One of the big goals is to take people from disparate business units that have been historically scattered across multiple buildings and bring them together into a space designed to maximize collaboration and spark creativity.

Read More