Skip to main content

Space Use

Reviving Legacy Buildings for 21st Century Science

Published 4/17/2019

Miami University and The Pennsylvania State University have transformed outdated buildings into modern STEM teaching and research centers while maintaining some of each building’s historic aspects. The projects aim to replace siloed labs, dark corridors, and dated HVAC systems with collaborative research facilities and up-to-date mechanicals, recapturing wasted space to provide areas where students can gather. Swing space for affected occupants was crucial—Miami University’s Pearson Hall remained partially occupied during construction, while Penn State’s Steidle Building was vacated—as was clear and frequent communication with faculty and other building users. Both projects required fairly complex phasing.

Read More

Designing the Veterinary School of the Future

Published 3/13/2019

When Texas A&M created a new set of buildings for its veterinary school, it sought to provide spaces that would work for current methods of teaching sciences, but also flexibility to accommodate future change. Change, as we all know, can be difficult, so the process included not just demountable walls and flexible furnishings, but also a focus on change management among the faculty.

Read More

Combining Research, Medicine, and Athletics to Create New Translational Models

Published 3/6/2019

An emerging new model for hybrid translational healthcare facilities combines scientific research with university and professional athletic programs to increase community engagement and student wellbeing. From integrating sports training facilities with medical clinics and applied research, to incorporating fitness gyms, running tracks, and rock-climbing walls into student lounges and public spaces, the combination of athletics and recreation with other programs offers an innovative vision for academic facility design.

Read More

UW Tacoma Renovation Creates Multi-Disciplinary Campus Magnet

Published 2/27/2019

When the small, commuter-focused University of Washington campus in downtown Tacoma decided to renovate the old Tacoma Paper and Stationery building, the idea wasn’t just to create a biomedical research lab, or an electrical engineering facility, or an urban studies center, or a community meeting place, or maker space. The goal was to accomplish all of those things in one facility, and to serve as a home away from home for students, faculty, and the greater Tacoma community, in spaces that were welcoming, informal, and multi-functional. Some of the biomed labs and classrooms have glass walls; many rooms have movable furniture and adaptable designs; and shared spaces allow individuals or groups to just pop in without reserving them in advance.

Read More

Space and Design Innovation in MRI Housing

Published 2/20/2019

In December 2016, Stony Brook Medical launched a plan to build housing for a pair of high-power MRIs, an older model 9.4-Tesla and a newer 7-Tesla. The original plan was to build a brick-and-mortar facility into their existing vivarium, but that was deemed too expensive, forcing them to consider other options. Glen Itzkowitz, dean of facilities and operations, and his team decided to pursue an option that had never been considered at Stony Brook—using pre-fabricated containers to house the MRIs, which they could just barely squeeze into a loading dock underneath a high-traffic footpath, space that was largely being wasted.

Read More

The Seven Steps of Innovation—and the Space Types that Facilitate the Process

Published 2/13/2019

Innovation has become the lifeblood of corporate and institutional longevity. Whether a disruptive breakthrough or a line extension, more often than not it is the result of an idea that follows an obscure networked path before evolving into a viable new product or business model. Facilities have a huge impact on the pace and outcome of the innovation process. A variety of spaces, each tailored to foster a specific type of activity, is essential to the innovative workplace. “At the end of the day, innovation is all about providing the right spaces to enable people to use their creative brains in the best manner to come up with new ideas,” says John Campbell, president and lead workplace strategist at the architecture firm FCA. “The design must address the human behaviors that drive the process.”

Read More

A Community College’s Lessons on Launching a Space Planning Organization

Published 2/6/2019

When Johnson County Community College asked them in 2015 to establish a space planning program, Janelle Vogler and Robyn Albano wondered where to start. Now they advise the college’s top decision-makers to optimize building utilization on campus. In launching a space planning organization from scratch, they point to several lessons they learned along the way: It’s vital to assign a point person to lead the effort; you need a team whose members commit to the institution’s interests above any one department; a successful organization will establish transparent processes for requests and decisions; and don’t be afraid to start data collection with a simple spreadsheet.

Read More

Managing Transformational Campus Renovation

Published 1/23/2019

University of Michigan transformed Weiser Hall—a 1960s brick tower with floor after floor of double-loaded, concrete block corridors—into a dynamic and flexible “center of centers” that brings together international and interdisciplinary institutes and centers so they can share space, services, and ideas. The provost’s charge was to renovate the building to create the “academic workplace of the future.” With the help of brightspot strategy and Diamond Schmitt architects, the team accomplished that mission with a seven-step formula that yielded impressive results, including an average overall productivity savings of 4.26 hours per person per week, the equivalent of every unit being able to grow its staff by 10 percent at no cost.

Read More

Designing Space for Nomadic Workers

Published 1/16/2019

More and more, workers aren’t going to an office and sitting at the same desk Monday through Friday. Today’s architects, builders, institutions, and designers need to plan for a future in which workers are nomads—moving from one place to another within a building or campus, or showing up in the office just one or two days a week. These nomadic workers are often mobile by choice, taking advantage of the flexibility that technology has enabled for academic staff, knowledge workers, and even healthcare employees.

Read More

Uptown Consortium Plans CoMade Innovation Hub

Published 11/5/2018

Uptown Consortium is planning to build the $26 million CoMade innovation hub in Cincinnati. Designed by BDR Design Group, the three-story, 100,000-sf facility will provide leasable space for startup companies engaged in product development and early-stage manufacturing operations. The building will also accommodate integrated job training programs to support the creation of a skilled workforce. Completion is expected by fall of 2020. The construction and land acquisition cost for the project is $21 million. 

Read More

Merck’s New Research Buildings Respond to Disruptive Technology, Changing Social Norms

Published 10/24/2018

The distinctive design characteristics of the tech workplace are spilling over into the scientific research environment. Elements like glass-walled open-plan offices and labs, activity-based spaces, and the embrace of WELL standards are all making an appearance in Merck & Co., Inc.’s new nine-story, multi-disciplinary discovery research facility, set to open in South San Francisco in 2019. Along with other yet-to-be determined innovations, these features likely will be incorporated in the $8 billion in U.S. capital projects the pharmaceutical giant announced it will invest in over the next five years.

Read More

From Steel to Software: Repurposing an Industrial Building for Education

Published 10/17/2018

Universities typically build or acquire new academic space sparingly, after long deliberation. When changing economic conditions dropped a whole campus into Lehigh University’s lap, the challenge has been to use that space in ways that support today’s education. Industrial giant Bethlehem Steel didn’t go formally bankrupt until 2001, but the writing was on the wall as early as 1987, when the company sold the majority of its “Mountaintop” research facility to Lehigh, which has since acquired two more buildings there, including Mountaintop C. That massive building’s three high bays attached to a curved bank of offices, is now home to student-driven projects in an environment that seeks to keep elements of the industrial feel and keep large bays as relatively rough, unfinished space.

Read More

Space Management Tools Are Key to Strategic Facility Planning

Published 8/29/2018

While the term “strategic facility planning” is often used generically to refer to a variety of initiatives, it is actually a unique discipline with a distinct meaning, says Debora Hankinson, architect and director of Strategic Facility Planning at CRB Consulting. As an end product, a strategic facility plan (SFP) is the overarching document that sets the direction for all further planning activities, from master (or campus) planning to the tactical steps of capital projects planning, move management, and deferred maintenance planning.

Read More

Bringing a Mid-Century Engineering Facility into the 21st Century

Published 8/15/2018

The College of Engineering, one of 15 colleges and schools at Cornell University, has 21 percent of the undergraduate population, 32 percent of the graduate population, and 10 percent of the square footage of the campus. As part of the college master plan, Upson Hall, originally built in the 1950s, and one of the largest buildings on the engineering quad, was in line for modernization. The plan called for improving energy efficiency, providing student and faculty collaborative space, and creating wet, hybrid, nano-, bio-, and chemical engineering labs. Since the building is well-located and structurally sound, with good floor-to-floor heights for labs, the decision was to renovate the existing structure, rather than undertake new construction. The project, a complete gut and renovation of the 160,000-gsf building, scheduled in two approximately year-long phases, was completed in August 2017.

Read More